Page 9: Water Systems 3 Water Systems The installation of the boiler must comply with the requirements of the current issue of BS, in Ireland, refer also to the current edition of I. Page 11 3 Water Systems 3. Page 12 3 Water Systems 3. Refer to diagram 4. Page 15 4 Flue and Appliance Preparation 4. Mark the boiler fixing points and mounting bracket position, see diagram 4. Drill holes and plug, to suit No.
Page 16 4 Flue and Appliance Preparation 4. Take the flue manifold from the loose items pack together with the sealant.
Place the sealant onto the flue manifold. Page 17 4 Flue and Appliance Preparation 4. On limited access installations push the flue assembly into the hole such that it is within the wall and does not stick out into the room, see diagram 4. Page Boiler Installation 5 Boiler Installation 5. COVER Remove the front cover by undoing the wing nut, nut and washer, lift the front cover off, see diagram 5.
Lefthand flue does not require cutting. Page 21 5 Boiler Installation 5. Do not operate the boiler wthout water. Make sure that the system has been thoroughly flushed out with cold water without the pump in place. Page 23 6 Commissioning The pilot flame length should be as shown in diagram 6. Caravan Spares. Central Heating Chemicals. Radiator Controls.
Fire Valves. Central Heating Pumps. Shower Pumps. Booster Pumps. Condensate Pumps. Pump Accessories. Smart Controls. Central Heating Controls. Motorised Valves. Heating Control Accessories. Central Heating Treatment. Central Heating Filters. Handwash Units. Water Treatment. Immersion Heaters. Tel: Fax: Nottingham Road, Belper, Derbyshire.
DE56 1JT. Tel: Fax: Thank you for installing a new Glow-worm appliance in your home. Glow-worm appliances' are manufactured to the very highest standard so we are pleased.
We recommend you complete and return your Guarantee Registration Card as soon as possible. SCREW 8. For cleaning do not use a wire or sharp instrument on the hole. If removed, use a little suitable sealant on the external thread when refitting to make sure a gas tight seal is made. Page 22 9 Fault Finding Diagram 9. Page 23 9 Fault Finding Diagram 9. Before replacing any parts isolate the boiler from the electrical supply and turn the gas supply off at the gas service cock, see diagram 6.
Page 26 10 Replacement of Parts Sides boiler by removing the hinge pins, see diagram 5. Carefully pull the control knob and extension piece away from Slide the insulation out. Make note of position of chamfer on the PCB. Left hand: chamfer bottom front. Right hand: chamfer top rear, see diagram Page 27 10 Replacement of Parts SCREW 2 Remove the air pressure tubes and electrical connections from the switch, release the screws and remove the switch.
When fitting the replacement make sure that the plastic tubes are fitted as shown in diagram Page Spare Parts 11 Spare Parts If ordering from the local gas undertaking also quote the GC number of the appliance.
Print page 1 Print document 28 pages. Rename the bookmark. Delete bookmark? Cancel Delete.
0コメント